2012 Restoration Flow Release Schedule
The Restoration Release Schedule for river flows from Lewiston Dam was approved by the Trinity Management Council on April 17th, 2012 and the U.S. Bureau of Reclamation issued a News Release on April...
View ArticleFINAL Environmental Assessment and Initial Study for Lower Steiner Flat and...
Lower Steiner Flat and Upper Junction City Site Final Environmental Document, May 18, 2012 Note: Signed Finding of No Significant Impact (FONSI) now added to document links. Document Links: Final EA/IS...
View Article2012 Channel Rehabilitation Information
For the summer and fall of 2012, TRRP will implement two channel rehabilitation sites. No gravel augmentation is planned. A public meeting will be held on June 12th. Click here for the flyer! Links to...
View ArticleTRRP 2011 Annual Report
The TRRP annual report for 2011 has been published and is available from the Document Library in our Online Data Portal (http://odp.trrp.net/Data/Documents/Details.aspx?document=1612).
View ArticleDRAFT Environmental Assessment and Initial Study for Douglas City and Lorenz...
Douglas City (River Mile 93.6-94.6) and Lorenz Gulch (River Mile 89.4-90.2) Trinity River Channel Rehabilitation sites Document Links: Draft EA/IS (10mb) Proposed project figures: Douglas City (3mb)...
View Article2013 Restoration Flow Release Schedule
The Restoration Release Schedule for river flows from Lewiston Dam was recommended by the Trinity Management Council on April 12th, 2013 and the U.S. Bureau of Reclamation issued a News Release on...
View ArticleNew River Access Point Now Open on Trinity River
New River Access Point Now Open on Trinity River A new boat ramp, improved road, parking area and a campground connector trail are now open at the Lorenz Gulch River Access along the...
View ArticleFINAL Environmental Assessment and Initial Study for Bucktail and Lower...
Bucktail (River Mile 105.3-106.4) and Lower Junction City (River Mile 78.8-79.8) Trinity River Channel Rehabilitation sites Document Links: Final EA/IS (including all appendices; 20mb) Response to...
View ArticleAdaptive Management Poster Session October 6
For Immediate Release Contact: Donna Rupp, TCRCD 623-6004 Adaptive Management Poster Session October 6 The public is invited to join the Collaborative Adaptive Management Network (CAMNet) at their...
View ArticleProposed 2015 Limekiln Gulch Channel Rehabilitation Site Draft Environmental...
Document Links: Final EA/IS (6 MB) Draft EA/IS (6 MB) Checklist (677kb) Excerpted Site Map (figure 3) (422kb) Public Meeting Display Ad (68kb) Other Relevant Documents: Master EIR Programmatic EIS/EIR...
View ArticleProposed 2016 Bucktail Channel Rehabilitation Site Draft Environmental...
Document Links: Draft EA/IS (14 MB) Checklist (0.45 MB) Excerpted Site Map (figure 3) (0.48 MB) Public Meeting Display Ad (0.12 MB) USBR News Release (web page) Presentations from Public Meeting:...
View ArticlePublic Meeting for 2017 Trinity River Flow and Gravel Recommendations
The Trinity River Restoration Program (TRRP), will host a public informational meeting to present the recommended 2017 spring restoration flow releases from Lewiston Dam and gravel augmentation plans....
View Article
More Pages to Explore .....